Romania
ENGLISH SEARCH
Properties
< Back
Upground Corporate Printer Friendly Version
Upground Corporate
Bucharest
Status: Under Construction
Type: Office
Size:  27,000 sqm
Contact:  Kevin Harrington
Tel:  +40 21 310 9380
Email:  kevin.harrington@eu.jll.com
Description

Headlines

  • Class A business park, in the vicinity of Pipera metro station
  • The Upground project assumes the challenge of originality, in what regards both architectural vision and general concept.
  • Became one of the most “cool hunted” locations by most of the multinational and local companies who are extending their businesses on the Romanian market.

Location

  • Pipera area, on Dimitrie Pompei St., in the 2nd district, within Pipera Business District.

Building description

  • Total rentable area of 27,000 sqm
    The north-eastern area – Dimitrie Pompeiu Boulevard, Pipera- Petricani highway – concentrated 63% of the office spaces requests materialized in lease and pre-lease.
  • Two office buildings built on a 28,000 sqm land, that will offer a work environment featured by the most modern standards in Romania
  • Efficiently organized space with very few lost common areas
  • Large surfaces on each level (up to 7,500 sqm)
  • Flexible as for the partition possibilities, so that the tenants may extend horizontally

Technical description

  • High floors and voice-data systems of excellent quality
  • Important autonomy as for the electric power sources due to the privileged UBI and systems and to the back up systems for HVAC
  • Numerous elevators functionally grouped, controlled by a management dedicated system.
  • Building management system with full control of the equipments and automate billing system for the utilities
  • Four pipes independent HVAC system with fan-coils mounted on the ceiling
  • Emergency generator for the vital systems and common areas of the building
  • Various telecom and internet service providers in the building
  • Control access and video surveillance system
  • 24 hours security
  • Smoke detectors and fire alarm system

Status

  • Phase II of the project in progress, with delivery by 2009.


 
| Privacy Statement | Terms of Use | Site Map | Login
10.20.2.94